Lean Principles
Lesson opener
In one line: Lean reduces waste and waiting so value flows to the customer. It is not a headcount target.
Why it matters: A programme that only means fewer people burns trust and leaves the delays in place.
Before this lesson: Bottleneck analysis
A sponsor announces a Lean programme and the team hears “fewer people.” Trust drops, and the real delays stay: reports nobody reads, the same data typed three times, and a month-end pile of invoices. Lean, done as a way to see waste, gives the team something to point at on the value stream. Done as a headcount target, it burns the people who know where the waste is.
What you will be able to do
- Separate value-adding work, necessary non-value work, and waste.
- Name the common waste types and circle one on a value stream.
- Explain flow and pull in ordinary office work.
- Design a two-week experiment with one waste, one metric, and a work-in-progress limit.
- Refuse a Lean plan whose only success measure is fewer roles.
Prerequisites
Bottleneck analysis. Bring the constraint and the value-stream timeline. This lesson uses the widely taught waste list as a checklist, not as a law that every delay fits one label.
Value, necessary work, and waste
Ask of every step: would the customer pay for this if they could see it?
- Value-adding work moves the product or service toward what was requested. Matching an invoice to a receipt, when that match is what allows a correct payment, is value for the supplier and the controller.
- Necessary non-value work is required by a control, a law, or a promise you intend to keep. Keep it, and spend as little time on it as the control allows.
- Waste is delay, rework, or effort no customer and no serious control requires. Remove it.
A control is not waste just because it is annoying. An approval with no decision, repeated three times, is waste wearing a control’s name.
Eight wastes as a checklist
A common teaching set, often remembered as TIMWOODS:
| Waste | What it looks like in office work |
|---|---|
| Transport | Files moved across shared drives with no change to the work |
| Inventory | Weeks of tickets or invoices sitting in a queue |
| Motion | Re-finding the latest template or the right folder |
| Waiting | Approval queues and batch windows |
| Over-production | Reports nobody uses for a decision |
| Over-processing | Typing the same fields into three systems |
| Defects | Wrong vendor codes that force a second trip |
| Skills unused | Analysts copying data instead of looking at the constraint |
Circle one waste on the value stream, preferably on or just before the constraint. Pick that one for a two-week experiment. A programme that attacks all eight in a week attacks none.
Teacher walkthrough: flow, pull, and a limit
Flow means work moves in small amounts, with less handoff friction, instead of sitting in a batch.
Pull means the next step starts work when it has capacity, rather than receiving a pile because the previous step found it convenient to push.
Example, with illustrative numbers: accounts payable can match about 40 clean invoices a day. Purchasing dumps 200 on the last day of the month. That is a push. The waste is waiting and inventory, and it lands on the constraint. A pull design releases invoices as receipts are confirmed, up to a work-in-progress limit of 40 in the matching queue. When the queue is full, upstream stops adding, and fixes incomplete receipts instead of adding more.
A 15-minute stand-up on the constraint only:
- What is blocking the constraint today?
- What finished yesterday that shows flow, as a count, not a story?
- What experiment runs this week?
The visible limit is the point. Without a number, “stop pushing” becomes a slogan.
A second workplace case
A reporting team produces a 30-page pack every Monday. Three pages are used in the management meeting. The rest is over-production. The experiment is to send only those three pages for two Mondays, and to count questions that could not be answered. If the questions are zero, the other pages were waste. If a regulator later needs a page, that page is necessary non-value and it returns. The experiment does not cut the analyst role. It cuts unused pages.
Failure example: Lean as a headcount cut
Symptom: A programme removes two clerk roles because “Lean means do more with less.” Invoice match time does not fall. The remaining clerks expedite for the loudest vendors. Defects rise because vendor codes are no longer checked.
Diagnosis: The value stream’s waste was a month-end push and a missing code on the receipt, not surplus people on a normal day. Removing roles elevated nothing and made the constraint worse. The customer of the process, the vendor waiting to be paid, was never asked which step they would pay for.
Correction: Restore the capacity you still need to clear clean work. Put the work-in-progress limit back. Spend the two weeks on the defect: a receipt cannot close without a valid vendor code, so bad items never reach the matcher. Measure median days to payment and the percent matched first time. Staffing changes wait until those numbers move and stay moved.
Validation: First-time match rises and the month-end pile shrinks, with the same or fewer expedites. A lower headcount without those movements is not a Lean result.
Prevention: A Lean experiment names the waste, the customer effect, and a metric that is not “roles removed.”
Pause and think
A legal retention check adds four minutes and prevents a fine. Someone labels it waste because the customer did not ask for it. What label fits, and what would you still try to reduce?
Guided practice: tag the steps
Scenario: A hiring process has these steps. The constraint is “create the system account,” which waits on a form that is often wrong.
- Manager writes a role description the candidate never sees, then rewrites it after each interview.
- Candidate uploads identity documents once.
- A coordinator retypes those documents into a second system.
- Security checks the right to work, which the law requires.
- IT creates the account from a form that is wrong on a third of cases.
Hints:
- Ask what the new hire and the hiring manager would pay for.
- A legal check can be necessary without being value-adding.
- Tie the experiment to the constraint.
Complete solution:
Step 1 is mostly over-processing: repeated rewriting the candidate never receives. Keep one clear description. Step 2 is value-adding input. Step 3 is over-processing and motion: the same data twice. Step 4 is necessary non-value; keep it, and do not bury it in a slower queue than the law requires. Step 5 is value-adding when the form is right, and a defect loop when it is wrong. The two-week experiment is at the constraint: reject an account form that fails three required fields, and count first-time complete forms. Success is a higher first-time rate and a shorter wait at IT, not a smaller HR team. The work-in-progress limit is the number of clean forms IT can finish in a day. Extra forms wait with the coordinator, who fixes them instead of pushing them.
Independent practice
Run the design of a two-week experiment. You do not have to finish the two weeks today.
Acceptance criteria:
- Every SIPOC step you include is tagged value-adding, necessary, or waste, with one sentence each.
- You select one waste on or before the constraint.
- The experiment states the change, the metric, the baseline, and the two-week end date.
- A work-in-progress limit is a number in front of the constraint.
- You name what must not get worse, such as a control or a customer promise.
- The success metric is not a headcount reduction.
Common mistakes
- Treating every control as waste, or treating every annoying step as a control.
- Starting eight waste projects at once.
- Pushing a month-end batch and calling the resulting overtime demand.
- Using Lean language to justify removing the people who do the work before the waste is removed.
- Holding a stand-up that reviews every step except the constraint.
Quick check
- What question separates value-adding work from waste?
- Name four wastes from the teaching list.
- Which design dumps a month-end batch, push or pull?
- What is a work-in-progress limit for?
- Why is “we removed two roles” a weak Lean result on its own?
Answers:
- Would the customer pay for this if they could see it? Necessary controls are a third category: keep them, and make them small.
- Any four from transport, inventory, motion, waiting, over-production, over-processing, defects, and unused skills.
- Push.
- It stops upstream from loading the constraint faster than it can finish.
- It does not show that delay, rework, or the customer’s wait improved.
Lesson summary
Lean removes waste and waiting so value flows. Tag the work, circle one waste, limit the pile in front of the constraint, and pull when the next step is ready. Keep the controls that protect the customer or the organisation. Do not call a headcount cut a result unless the waste metric moved.
Bridge to the next lesson
Some problems are not a visible pile. The outcome is fine on Monday and badly late on Thursday, and nobody can say why. The next lesson uses a simple Six Sigma path to define that variation, measure it, and stop a fix from slipping back. Bring one metric that swings.