Rana Maninder Singh
Lesson 6 of 8Data Visualization & Dashboard Design

Storytelling with Data

Lesson opener

In one line: A data story is one claim, evidence that could have proved you wrong, and a dated ask — charts are scenes, not the plot.

Why it matters: Stakeholders remember the decision, not your fourteen visuals. UX for analytics made the scenes readable. This lesson is the plot for a review meeting: what you want the room to believe, what would change your mind, and who does what by when.

Before this lesson: UX for analytics

Before you start

Twenty minutes with the MD

Vikram is the plant manager at Kairo Textiles, a Ludhiana mill. Once a month he has twenty minutes with the MD. He used to walk through every loom dashboard. The MD remembered none of it. After a bad quarter Vikram was asked, “So what do you want from me?” and he did not have a sentence. That question is this lesson.

The five beats (one page or one meeting)

  1. Context — period, scope, what “good” looks like (the target you already hired).
  2. Claim — one sentence a sceptic can disagree with. Not “here is the dashboard.”
  3. Evidence — one or two visuals that could have shown the opposite.
  4. Cause hypothesis — ranked, not twelve guesses. Label it as a hypothesis until you have a test.
  5. Ask — a decision or experiment, with owner and date.

If you cannot state the claim, you are still exploring. Do not present yet. Exploring is honourable; presenting exploration as a story is how meetings melt.

A claim has a polarity. “On-time finish on loom 4 is 88% vs 96% in March, driven by warp breaks on SKU L-210” can be false in two ways: the 88% is wrong, or warp breaks are not the driver. Your evidence must address at least one.

Pause. Vikram’s draft claim is “Quality is a journey and we are committed to excellence.” What is missing?

Every part of a story. No period, no target, no measure, no ask. A claim names a number, a comparison, and a time window.

Annotation beats a paragraph that will rot

Put the takeaway on the chart, dated:

21 Mar: Loom 4 missed 96% OTIF — 61 of 72 delayed rolls were SKU L-210 warp breaks

A text box titled “Insights” that says “Leadership should continue to monitor quality” is stale by next month and has no owner. Management commentary is a caption with a name and a date, or it is decoration.

Leave the dashboard open in Q&A. Do not jump to a hidden tab of extra charts — that is a second, unannounced story.

A twenty-minute talk track

MinuteDo
0–1Context + claim (strip already shows the miss)
1–3Evidence chart (the driver you chose in lesson 2/5)
3–4Exceptions table (the SKUs or customers to act on)
4–5Ask / owners / date
5–20Questions, still on the same page

If the MD asks “what about loom 7?” that is a drill, not a new story. Lesson 7 keeps the filter context. Do not start a second claim unless you close the first ask.

Walkthrough: Vikram’s March review

Inputs. Promised rolls in March: 600. Delivered on the promised date: 528. OTIF = 528 / 600 = 88.0%. Target 96% would be 0.96 × 600 = 576 on time, so the miss is 576 − 528 = 48 extra delayed rolls. Delayed rolls in total: 72. Of those 72, 61 are SKU L-210 on loom 4. 61 / 72 ≈ 85% of the delay pile, not “the whole plant.”

Context. March, weaving plant, OTIF target 96% of promised rolls.

Claim. “We missed OTIF by 8 points (88% vs 96%), and about 85% of the delayed rolls were one SKU on one loom — not a plant-wide quality collapse.”

Evidence. Bar of OTIF by loom vs 96% (loom 4 at 72%, others ≥ 95%). Then a small table: delayed rolls by SKU on loom 4. If loom 4 had been at 96%, 61 of those 72 delays would not exist and the claim would be false — good, that means the chart is evidence rather than illustration.

Hypothesis. Warp yarn lot W-19 on L-210. Not yet proven. Ask is an experiment, not a firing.

Ask. Quality owns a trial of lot W-20 on loom 4 by 4 April; Sales will not promise L-210 on 72-hour lead times until OTIF on that SKU is back above 96% for two weeks. Owners: Quality lead, Sales ops. Dates on the slide.

Deliberate mistake. Vikram adds a second claim in minute 6: “Also, power cost is up.” No evidence ready. The MD chases power. The L-210 ask is never agreed.

Symptom. Minutes of the meeting mention “monitor energy” and omit the trial.

Diagnosis. Two stories, one slot. The second claim had no evidence and no ask.

Correction. Power cost gets a line in “parking lot” or a separate 10-minute slot next month.

Prevention. One claim per packed review. A second claim needs its own evidence pair or it waits.

Validation. A colleague who was not in the plant can repeat 88% vs 96%, 61 of 72, and the 4 April trial from the annotated screenshot alone.

Second case: a collections call, not a mill

Anjali in Vizag collections has ten minutes with the finance director.

Inputs. Overdue AR: ₹2.80 crore. Four hospital groups: ₹0.90 + ₹0.55 + ₹0.40 + ₹0.25 = ₹2.10 crore. 2.10 / 2.80 = 75% of overdue sits in four names. DSO 39 vs 35 as in the finance lesson’s arithmetic family — she does not re-derive DSO here; she uses Finance’s number and shows where the days hide.

Claim. “Three-quarters of overdue rupees are four hospital groups with broken promises, not a broad slip across every account.”

Evidence. Aging bar for the book, plus a four-row table of those groups with last-promise date and last receipt. If the four rows had been 20% of overdue, the claim would be false. The mill’s loom bar is the wrong picture; here the exceptions table is the evidence.

Ask. Director joins Thursday calls; freeze new credit for those four until a receipt posts. Owners and 27 Mar date on the caption.

The mill story does not map by renaming SKUs to hospitals. The five beats stay. The evidence object changes.

Practice

You have eight minutes with the head of a Bhopal bus depot. Data: on-time departures 81% vs 95% target this week; 40 of 55 late trips are the 6 a.m. Indore route; two drivers off sick; a pie of “delay reasons” with 11 slices.

Required. Write context, claim, evidence (which visuals), hypothesis, ask with owner and date. Say what you will not present.

Hints: the pie is not evidence until it is a bar of the top reasons on that route; sickness may be a hypothesis, not a fact, unless the roster shows it.

Model solution. Claim: “The depot miss is concentrated on the 6 a.m. Indore route (40 of 55 lates), not a network failure.” Evidence: on-time % by route vs 95%; table of Indore 6 a.m. trips. Hypothesis: roster gaps — confirm from the roster before the ask. Ask: operations to cover the 6 a.m. pair by Monday, owner = depot manager. Do not present the 11-slice pie.

Independent: municipal water, not buses

Setting. A Shimla municipal meeting. Night-time leakage is up. You have zone-level flow, a target, and three contractor crews.

Deliverable. A five-beat story and a one-screen pairing (strip + one chart + exceptions). One ask with a date.

Constraints. One claim. No second topic (billing, staffing) in the same five minutes. Commentary dated and named.

Model approach. Claim names the zone and the gap vs the leakage target. Evidence is zone comparison plus the night flow trend. Ask: crew 2 on Zone C valves by Friday, with a re-measure date.

Where this connects

You can now refuse a tour of fourteen visuals, write a claim that could be false, put the takeaway on the chart, and leave with an owned date. Navigation next: when the MD says “show me loom 4,” the page should drill without starting a new story.

Workplace action. Before your next review, write the claim on paper. If you cannot, you are not ready to present the dashboard.

Next lesson: Drilldowns & navigation. The story stays intact only if filters, drills, and tooltips carry the same period and the same question.