Rana Maninder Singh
Lesson 6 of 8Setup Guide

Organising an analysis project

Lesson opener

In one line: This is for analysis that answers a question and then has to be defensible later.

Why it matters: This shows up at work when you need to one folder layout that works for Excel work, SQL work and notebook work - and the three rules that make it survive six months of neglect..

Before this lesson: Git & workflow

Before you start

ResourceLink
PreviousGit & workflow
NextNode.js & npm install

No prerequisites. If you have ever opened a folder and found final_v2.xlsx, final_v3.xlsx and final_v3_ACTUAL_USE_THIS.xlsx sitting next to each other, this lesson is for you.

What you will learn

One folder layout that works for Excel work, SQL work and notebook work — and the three rules that make it survive six months of neglect.

How to organise an analysis project
How to organise an analysis project

The problem this solves

Analysis work is not lost because people cannot analyse. It is lost because six months later nobody can answer three questions:

QuestionWhat it costs when you cannot answer it
Where did this number come from?You rebuild the whole analysis to defend one figure in a meeting
Is this file current?You present last quarter's data and find out in the room
Which version did we actually send?Two people quote different totals from "the same" report

A folder structure is not admin. It is the thing that lets you answer those three questions in under a minute.


The structure

One folder per job, not per month, not per tool. A job is a question somebody asked you.

FolderWhat goes in itWhat does not
00-brief/What was actually asked, in writing, and who askedYour interpretation of it
01-source/Exports exactly as they arrived, date-stampedAnything you have touched
02-working/Cleaned files, scratch notebooks, half-finished thingsAnything you would show a stakeholder
03-analysis/The queries and notebooks that produce the answerData cleaning steps
04-output/The deck, the report, the charts you actually sentDrafts
README.mdWhat the job was, how to re-run it, where the source came fromEverything else

Rule 1 — Number the folders

Windows File Explorer sorts alphabetically. Without numbers, analysis comes before source, and brief comes before both — the exact reverse of how you work.

Two digits, not one. 01 through 04 today; when you add 10-appendix later, 1-brief would sort next to it and the order breaks.

Rule 2 — Source data is read-only

The single most expensive habit in analysis work is opening the export, fixing a few rows, and saving over it. The moment you do that, the raw data is gone and every number you produce becomes unverifiable.

Treat 01-source/ as if it were on someone else's computer. Read from it. Never write to it.

Alongside each export, drop a plain text file:

sales-export-2026-08-14.xlsx

Pulled from : ERP > Reports > Sales by Region
Pulled by   : Rana
Pulled on   : 14 Aug 2026, 09:20
Filters     : FY2026 Q3, all regions, excludes cancelled orders

Thirty seconds of typing. It is the difference between "I think this is Q3" and knowing.

Rule 3 — Date-stamp, do not version-guess

sales-export-2026-08-14.xlsx tells you when the data is from.

final_v3_ACTUAL_USE_THIS.xlsx tells you that at some point somebody was tired.

Use YYYY-MM-DD — it sorts correctly, and it is unambiguous in every country. 08-14-2026 and 14-08-2026 are the same file to you and different files to a colleague.


The README

One file, at the top, written when you finish — not when you start.

# Q3 2026 sales review

Asked by  : Priya (Regional Head), 12 Aug 2026
Question  : Why did North region revenue drop in Q3?
Answer    : Two accounts churned in July; the rest of the region grew 4%.

Source    : 01-source/sales-export-2026-08-14.xlsx (ERP, Q3 FY26)
Analysis  : 03-analysis/revenue-by-region.sql
Sent      : 04-output/q3-review.pptx, 19 Aug 2026

Six lines. In six months this is the only thing standing between you and rebuilding the entire job from memory.


Practice

You do not need a finished analysis for this. Build the empty shell once, so the habit is ready before the first real job arrives.

  1. Pick a made-up question — for example: "Which region sold the most last month?"
  2. Create one job folder named YYYY-mm-topic (e.g. 2026-08-region-sales/).
  3. Inside it, create the five folders from this lesson plus an empty README.md.
  4. In 00-brief/, write one sentence: who asked, and what they asked.
  5. In 01-source/, add a short where-it-came-from.txt with placeholder lines (system, date, filters) — leave the export itself for when you have real data.

When a real export shows up later, it drops into 01-source/ untouched. Cleaning starts in 02-working/. You will never be deciding folder names under deadline pressure.

What this is not

This is not a software project layout. If you have seen structures with src/, __init__.py and unit tests, those are for code that ships and gets maintained by a team.

This is for analysis that answers a question and then has to be defensible later. Different job, different shape.

Teacher walkthrough: folders that survive Monday

All figures illustrative.

Step 1 — Separate raw, interim, outputs. Never overwrite raw extracts.

Step 2 — One README with question, grain, and how to rerun.

Step 3 — Pin environment (requirements.txt / env name).

Step 4 — Name notebooks/scripts by purpose, not final_v7.

Failure example: overwritten raw CSV

Symptom: Cannot reproduce last week's number; blame spreadsheets.

Diagnosis: Cleaned file saved over raw download.

Correction: data/raw read-only habit; writes only under data/interim or outputs.

Validation: Raw checksum/date unchanged after analysis.

Guided practice

Where should a one-off exploratory chart PNG go?

Complete solution: outputs/ (or dated subfolder) — not beside raw CSVs.

Independent practice

Acceptance criteria:

Common mistakes

  1. Mixing secrets into the repo root.
  2. Multiple "final" notebooks with diverging logic.
  3. No record of filter criteria.