Rana Maninder Singh
Lesson 6 of 10Business Analytics

Operations Analytics

Lesson opener

In one line: Operations analytics matches supply with demand — forecasts, elasticity, inventory, and capacity — so service and cost stay in balance.

Why it matters: Marketing growth that ops cannot fulfil becomes stockouts, overtime, and margin loss.

Before this lesson: Descriptive analytics; Prescriptive analytics for newsvendor/order quantity.

Goal

Match supply with demand profitably under uncertainty (inventory, staffing, capacity).

Supply and demand
Supply and demand

Demand forecasting

Price elasticity

Forecasting asks how demand moves with time; elasticity asks how it moves with price.

Price elasticity of demand = % change in quantity demanded ÷ % change in price.

Example intuition: raise price 10% — if demand drops only 2%, demand is inelastic (price hike can make sense); if it drops 15%, demand is elastic (volume loss likely wipes out the gain).

Worked example (SKU P12): Price ₹500 → ₹550; weekly demand 1,000 → 850 units.

Takeaway: Do not push another price increase on P12 — volume falls faster than price rises. Hold (or test a cut) and rely on the forecast for stocking, not on a richer unit price.

Inventory

ConceptMeaning
Lead timeDelay from order to receipt
Safety stockBuffer for demand variability
Reorder pointWhen to place order
EOQEconomic order quantity (balance holding vs ordering cost)

Capacity

Risk and reward

Sample: weekly demand summary

import pandas as pd

ops = pd.read_csv("data/operations.csv")
weekly = ops.groupby(["product_id", "week"]).agg(
    demand=("units_demand", "sum"),
    fulfilled=("units_fulfilled", "sum"),
).assign(fill_rate=lambda x: x["fulfilled"] / x["demand"])

Teacher walkthrough: fill rate then elasticity

All figures illustrative.

Step 1 — Measure service. From operations.csv, compute fill rate = fulfilled / demand by product-week.

Step 2 — Find chronic underperformers. SKUs with fill rate < 90% for 3+ weeks.

Step 3 — Separate demand shock vs supply failure. Rising demand + flat receipts → capacity/lead-time; flat demand + falling fulfilled → warehouse/process.

Step 4 — Price check. For a candidate price hike, compute elasticity (as in P12 example). If |E| > 1, do not "fix margin" with another increase.

Step 5 — Prescribe. Safety stock or expedite for supply-limited SKUs; hold price on elastic SKUs; feed order qty to Prescriptive.

Failure example: forecast without fill rate

Symptom: Forecast accuracy looked fine (low MAPE) while customers saw empty carts on bestsellers.

Diagnosis: Error metric on aggregate demand hid SKU-level stockouts; no fill-rate KPI in the pack.

Correction: Add fill rate and stockout hours beside MAPE; review at SKU-week grain.

Validation: Ops review blocks on any top-20 SKU with fill rate < 95% even if MAPE is green.

Guided practice

Demand 800, fulfilled 720. Fill rate? If elasticity on the same SKU is −1.5, do you raise price to "cover" stockouts?

Complete solution: Fill rate = 90%. No — raising price on an elastic SKU cuts volume further; fix supply/safety stock first.

Independent practice

Acceptance criteria:

Common mistakes

  1. Celebrating forecast MAPE while fill rate is red.
  2. Safety stock without stating service-level target.
  3. Price increases on elastic SKUs to mask supply failure.
  4. Capacity utilisation at 98% treated as success (queues explode).

Checklist

  • [ ] I calculated fill rate or service level for a product
  • [ ] I explained understock vs overstock tradeoff
  • [ ] I sketched one forecasting approach for next 4 weeks
  • [ ] I classified one SKU as elastic or inelastic and stated a pricing takeaway
  • [ ] Acceptance criteria above are met